Back to ARB Virtual Event View Cart: 0 items

Scaffold

Home » Scaffold » Page 2

Scaffold

  • Brackets & Clamps

    Wide variety of brackets & clamps for scaffolding. Clamps & brackets for notched & hole braces, parallel tube clamps, B-lock clamps.
    Various clamps to be used for scaffolding
  • Replacement Parts for Scaffold

    Scaffold replacement parts including clamps, hooks, brace slides & rivets, leveling nuts, screws, & U-bolts.
    Half Outrigger Clamp, Putlog Clamp Hook, Gooser Brace Slide, Leveling Nut, Set Screw, Lever Tail Nut 5" Long , Brace Rivet with 3 Washers, U-bolt only - Putlong Angle Hanger, Thumb Screw
  • Panel Guard System

    A complete safety solution that includes a top rail, mid-rail & toeboard. Installs quickly & easily.
    • Easy and quick to install
    • Panels include top rail, mid-rail and toeboard
    • Hinge pins are recommended to prevent uplift
    • Easi-Guard and Panel-Guard components are not interchangeable.
  • Intermediate Guard Rails

    Intermediate guard rails attach to open end scaffold frames to ensure worker safety. Side & end panels available.
    • Used for Open End Frames
    • Side and end panels available
  • Swing Gates

    Swing gates for Open End frames allow workers to move between scaffold sections & provide a guard rail for safety.
    • Used specifically for Open End Frames
    • Allows workers to move between scaffold sections
    • Provides a guard rail between scaffold sections
  • Outriggers

    Triangular outrigger brackets increase scaffolding base width & provide stability. Use with casters or leveling jacks.
    • Used to increase the base width
    • Increase the stability of the tower
    • Can be used with casters or leveling jacks
  • Easi-Guard Panel System

    Easi-Guard Panel System assembles quickly & easily to provide safety on scaffold platforms. Includes top rail & chained mid-rail.
    • Easy and quick to install
    • End panels use steel tubular top rail with chained mid-rail for easy platform entry
    • End panels include built in 6" steel toeboard
    • End panel toeboard adjusts to accomodate various deck styles
    • Easi-Guard and Panel-Guard components are not interchangeable.
  • Scaffold Tie Brace

    Adjustable scaffold tie braces secure scaffolding to a wall & may be used in place of outriggers when safe.
    • Adjusts from 4″ – 32″ from scaffold structure
  • Tube-N-Clamp Components

    This scaffolding system uses vertical & horizontal steel clamps connected with right angle clamps. Assemble yourself for versatility.
    Components used to build Tube-N-Clamp scaffolding
  • Heavy Duty Stair Tower

    Heavy duty stair tower package provides 100' access & includes all components for complete scaffold assembly.
    Bil-Jax offers a heavy duty stair scaffolding system for worker access to buildings, bridges, observation towers, or renovation done inside or outside. The stairs can also be used for access in a scaffold set-up. Stair Tower Packages include frames, braces, leveling jacks, stair sections with handrails, stair rests, full top platform and top panel guard.
  • Shoring Posts – Galvanized

    Electroplated steel shoring posts are easily adjustable & offer a strong, durable, corrosion-resistant solution for securing scaffolding.
    • Galvanized steel posts
    • Easily adjustable
    • Range of sizes available
  • Shoring Posts – Electroplated

    Electroplated steel shoring posts are easily adjustable & offer a strong, durable, corrosion-resistant solution for securing scaffolding.
    • Electroplated steel posts
    • Easily adjustable
    • Range of sizes available
  • Heavy Duty Shoring Posts

    Galvanized heavy duty steel posts are made for jobs requiring extra strength and durability and are rated up to 6,000 lbs. (5,000 lbs. if height exceeds 10’). They are easily adjustable and available in a range of sizes.
    • Galvanized heavy duty steel posts
    • Easily adjustable
    • Range of sizes available
  • Shoring Frames

    These are the main components of shoring scaffolding and are used to build up shoring scaffolding units.
    • See page 14 of our Scaffold Catalog for bracing information
  • Shoring Components

    All the shoring components needed to safely support scaffolding. Leveling jack, shoring head, insert pin/collar, top nut & brass plate.
    • Leveling Jack
    • Shoring Head
    • Insert Pin and Collar
    • Top Nut
    • Base Plate
  • Ring Lock – Stair Tread

    Stair treads for ring lock scaffolding attach to stringers to form stairs. Raised holes provide traction.
    • The step piece that attaches to a stringer
    • Raised holes for traction
  • Pro-Jax Components

    Guard rails, outriggers, guard panels, metal & plywood decks, arm braces, ladder frame, casters for Pro-Jax scaffolding.
    Guard Rails, outriggers, guard panels, metal deck, plywood deck, arm brace, ladder frame, casters
  • Ring Lock – Stair Stringer

    These Ring Lock Stringers are several pieces of steel conjoined together to form one side of a scaffolding stair unit.
    • Side pieces that make the stair unit
    • Two stringers are needed to make a complete stair unit
  • Pro-Jax Outrigger Packages

    Triangular outrigger brackets increase scaffolding base width & provide stability. 18", 24", & 48" packages available.
    18", 24" and 48" wide packages
  • Ring Lock – Stair Stringer with Channel

    Stair stringers for ring lock scaffolding are the side pieces that make up the stair unit. Features a channel down the back.
    • Side pieces that make the stair unit
    • Two stringers are needed to make a complete stair unit
    • Features a channel down the back
  • Pro-Jax Guard Rail Packages

    Guard rails ensure worker safety at height. 6', 8', & 10' packages available.
    6', has 8', and 10' packages
  • Shore Head and Shore Jacks

    Shore heads & shore jacks provide temporary scaffolding support & enable you to make structural repairs.
    • various sizes of shore heads and shore jacks with heads
  • Ring Lock – Spigot Clamp

    Spigot clamp for ring lock scaffolding clamps onto trusses to hold verticals in place.
    • Clamps on to trusses
    • Holds verticals in place
  • Pro-Jax Additional Height Packages

    Add height to your Pro-Jax scaffolding unit with additional height packages.
    Adds height to the Pro-Jax unit
  • Ring Lock – Vertical Diagonals

    Vertical diagonal posts stabilize ring lock scaffolding. Features the connecting portion of the rosette joint design.
    • Featuring the connecting portion of the rosette joint design
    • Stabilizes the verticals and Ring Lock scaffolding
  • Ring Lock – Planks

    Steel plank for ring lock scaffolding is fixed on the ring lock ledger for workers to walk on. Available in raised or flush styles.
    • Available in raised or flush
  • Ring Lock – Leveling Jack

    Leveling jack for ring lock scaffolding with a steel rod & square base for stability. Set to custom heights on uneven surfaces.
    • Can be set to custom heights
  • Ring Lock – Side Bracket

    Side brackets for ring lock scaffolding are made of steel rods in a stabilized triangle. Features the connecting portion of the rosette joint design.
    • Featuring the connecting portion of the rosette joint design
  • Ring Lock – Truss

    Trusses for ring lock scaffolding stabilize the verticals & feature the connecting portion of the rosette joint design. Used to span over large areas.
    • Featuring the connecting portion of the rosette joint design
    • Stabilizes the verticals
    • Used to span over large areas and openings
    • Can create temporary roof structures
  • Ring Lock – Horizontals

    These Ring Lock Horizontal posts are composed of a single rod of steel with the connecting portion of the rosette design.
    • Featuring the connecting portion of the rosette joint design
    • Stabilizes the verticals
  • Sidewalk Frame

    Sturdy steel sidewalk frame supports plywood & other protective coverings to shield passersby from falling debris.
    • Furnished with hex nut lock standard
    • Can be ordered with inserts attached
  • Ring Lock – Verticals without Inserts

    Vertical posts for ring lock scaffolding consist of a steel rod with the ring portion of the rosette joint design. Ideal for structures with complicated shapes.
    • Featuring a rosette joint design for multiple angles
  • Ring Lock – Verticals

    These Ring Lock Vertical posts are composed of a single rod of steel with the ring portion of the rosette design as well as steel inserts for connecting to other vertical posts.
    • Featuring a rosette joint design for multiple angles
    • Inserts included
  • Guard Rail Posts

    Guard rail posts secure conventional guard rail systems to ensure safety & comply with local, state & federal regulations.
    • Conventional guard rail system
    • Must be used with toeboards, on all scaffolds, in compliance with local, state and federal regulations
  • Inline Side Brackets

    Inline side brackets add adjustable work space & provide scaffolding access next to a building or wall. Easy to set up and take down.
    • Adds adjustable work height
    • Easy to set up and take down
    • Add additional work space
  • Inspection Tags

    Worker safety scaffold inspection tags with Danger and Completed inserts, English
    Scaffold inspection safety tags with plastic holders. With Danger and Completed tag inserts, English. Additional safety material, Scaffold Replacement Decals
    • Plastic tag holder
    • Scaffold Completed tag insert
    • Scaffold Incomplete tag insert
    • Scaffold Released for Access tag insert