- Side pieces that make the stair unit
- Two stringers are needed to make a complete stair unit
Scaffold
-
Ring Lock – Stair Stringer
These Ring Lock Stringers are several pieces of steel conjoined together to form one side of a scaffolding stair unit. -
Ring Lock – Stair Tread
Stair treads for ring lock scaffolding attach to stringers to form stairs. Raised holes provide traction.- The step piece that attaches to a stringer
- Raised holes for traction
-
Ring Lock – Stair Stringer with Channel
Stair stringers for ring lock scaffolding are the side pieces that make up the stair unit. Features a channel down the back.- Side pieces that make the stair unit
- Two stringers are needed to make a complete stair unit
- Features a channel down the back
-
Ring Lock – Truss
Trusses for ring lock scaffolding stabilize the verticals & feature the connecting portion of the rosette joint design. Used to span over large areas.- Featuring the connecting portion of the rosette joint design
- Stabilizes the verticals
- Used to span over large areas and openings
- Can create temporary roof structures
-
Side Brackets
Side brackets extend scaffolding platform closer to building or wall for extra work space.Side Brackets or Saddle Hangers are built for Bil-Jax Scaffold Systems. Adjustable options as well as Tube or Plate end options are available. Standard tube size is 7. Made in the USA. Capacity 500 lb. All brackets should be pinned properly in place. -
End Brackets
End brackets attach to the end of scaffolding so platforms can be run parallel to frames, adding additional work space & adjustable height.- Adds adjustable work height
- Easy to set up and take down
- Add additional work space
-
End Guard Rail for Side Bracket
End guard rail is used with side brackets as a guar rail to ensure worker safety.- Used with side brackets as a guard rail
-
Lateral Braces
Lateral braces are used with cat-a-corner braces to provide extra support. Connect perpendicularly at the base to keep scaffolding squared.- Needed every 20’ in height
-
Hoist Arm and Well Wheel
Swivel head hoist arm & well wheel provides an easy way to lift loads up to 100 lbs. to the top of the scaffolding structure.- Used to hoist tools up to workers
-
Putlogs
Putlogs secure scaffolding directly to a wall in light duty applications. Standard & trussed putlogs are available.- Only to be used for light duty applications
- Spans over a larger area
- Putlogs are used as a low cost alternative for larger platforms or bridging obstructions
-
Leveling Jacks
Adjustable leveling jacks can be set to custom heights & provide a solid foundation for the scaffolding frame.Adjustable Leveling Jack is ideal for ensuring a solid foundation for a scaffolding frame, especially when it is assembled along an external wall. -
Base Plates/Rubber Pad
Base plates serve as scaffolding unit feet, preventing slipping & sinking. Includes rubber pad to prevent marring.- The “feet” to scaffolding units • Comes in both rigid and swivel configurations
- Rubber pad used to prevent maring of high end finished floors (hardwood, marble, etc.)
-
Scaffold Guard Rails
Galvanized tubing guard rails attach to scaffolding to ensure worker safety. Compatible with B, F, or U lock guard rail posts.- Galvanized tubing that attaches to scaffolding for safety
- Use with B, F, or U Lock Guard Rail Posts
-
Steel Toeboards
Toeboards prevent tools & other objects from falling from scaffolding decks & causing injury to people below.- Provides safety to the scaffolding platforms
- Must be used on all scaffolds in compliance with local, state, and federal regulations
-
Putlog Accessories
Accessories help simplify mounting putlogs. Angle hangers, saddles, spreaders & putlog support with clamps. -
Drop Forged Clamps
Complex drop forged steel clamps precisely engineered to hold scaffolding tubes together safely & efficiently. Rigid & swivel styles available.- Clamps that are used to hold scaffolding tubes together
- Offered in both rigid and swivel
-
Brackets & Clamps
Wide variety of brackets & clamps for scaffolding. Clamps & brackets for notched & hole braces, parallel tube clamps, B-lock clamps.Various clamps to be used for scaffolding -
Replacement Parts for Scaffold
Scaffold replacement parts including clamps, hooks, brace slides & rivets, leveling nuts, screws, & U-bolts.Half Outrigger Clamp, Putlog Clamp Hook, Gooser Brace Slide, Leveling Nut, Set Screw, Lever Tail Nut 5" Long , Brace Rivet with 3 Washers, U-bolt only - Putlong Angle Hanger, Thumb Screw -
Panel Guard System
A complete safety solution that includes a top rail, mid-rail & toeboard. Installs quickly & easily.- Easy and quick to install
- Panels include top rail, mid-rail and toeboard
- Hinge pins are recommended to prevent uplift
- Easi-Guard and Panel-Guard components are not interchangeable.
-
Intermediate Guard Rails
Intermediate guard rails attach to open end scaffold frames to ensure worker safety. Side & end panels available.- Used for Open End Frames
- Side and end panels available
-
Swing Gates
Swing gates for Open End frames allow workers to move between scaffold sections & provide a guard rail for safety.- Used specifically for Open End Frames
- Allows workers to move between scaffold sections
- Provides a guard rail between scaffold sections
-
Outriggers
Triangular outrigger brackets increase scaffolding base width & provide stability. Use with casters or leveling jacks.- Used to increase the base width
- Increase the stability of the tower
- Can be used with casters or leveling jacks
-
Easi-Guard Panel System
Easi-Guard Panel System assembles quickly & easily to provide safety on scaffold platforms. Includes top rail & chained mid-rail.- Easy and quick to install
- End panels use steel tubular top rail with chained mid-rail for easy platform entry
- End panels include built in 6" steel toeboard
- End panel toeboard adjusts to accomodate various deck styles
- Easi-Guard and Panel-Guard components are not interchangeable.
-
Inline Side Brackets
Inline side brackets add adjustable work space & provide scaffolding access next to a building or wall. Easy to set up and take down.- Adds adjustable work height
- Easy to set up and take down
- Add additional work space
-
Scaffold Tie Brace
Adjustable scaffold tie braces secure scaffolding to a wall & may be used in place of outriggers when safe.- Adjusts from 4″ – 32″ from scaffold structure
-
Tube-N-Clamp Components
This scaffolding system uses vertical & horizontal steel clamps connected with right angle clamps. Assemble yourself for versatility.Components used to build Tube-N-Clamp scaffolding -
Heavy Duty Stair Tower
Heavy duty stair tower package provides 100' access & includes all components for complete scaffold assembly.Bil-Jax offers a heavy duty stair scaffolding system for worker access to buildings, bridges, observation towers, or renovation done inside or outside. The stairs can also be used for access in a scaffold set-up. Stair Tower Packages include frames, braces, leveling jacks, stair sections with handrails, stair rests, full top platform and top panel guard. -
Pro-Jax Components
Guard rails, outriggers, guard panels, metal & plywood decks, arm braces, ladder frame, casters for Pro-Jax scaffolding.Guard Rails, outriggers, guard panels, metal deck, plywood deck, arm brace, ladder frame, casters -
Shoring Posts – Galvanized
Electroplated steel shoring posts are easily adjustable & offer a strong, durable, corrosion-resistant solution for securing scaffolding.- Galvanized steel posts
- Easily adjustable
- Range of sizes available
-
Shoring Posts – Electroplated
Electroplated steel shoring posts are easily adjustable & offer a strong, durable, corrosion-resistant solution for securing scaffolding.- Electroplated steel posts
- Easily adjustable
- Range of sizes available
-
Heavy Duty Shoring Posts
Galvanized heavy duty steel posts are made for jobs requiring extra strength and durability and are rated up to 6,000 lbs. (5,000 lbs. if height exceeds 10’). They are easily adjustable and available in a range of sizes.- Galvanized heavy duty steel posts
- Easily adjustable
- Range of sizes available
-
Shoring Frames
These are the main components of shoring scaffolding and are used to build up shoring scaffolding units.- See page 14 of our Scaffold Catalog for bracing information
-
Shoring Components
All the shoring components needed to safely support scaffolding. Leveling jack, shoring head, insert pin/collar, top nut & brass plate.- Leveling Jack
- Shoring Head
- Insert Pin and Collar
- Top Nut
- Base Plate
-
Shore Head and Shore Jacks
Shore heads & shore jacks provide temporary scaffolding support & enable you to make structural repairs.- various sizes of shore heads and shore jacks with heads
-
Guard Rail Posts
Guard rail posts secure conventional guard rail systems to ensure safety & comply with local, state & federal regulations.- Conventional guard rail system
- Must be used with toeboards, on all scaffolds, in compliance with local, state and federal regulations
-
Inspection Tags
Worker safety scaffold inspection tags with Danger and Completed inserts, EnglishScaffold inspection safety tags with plastic holders. With Danger and Completed tag inserts, English. Additional safety material, Scaffold Replacement Decals- Plastic tag holder
- Scaffold Completed tag insert
- Scaffold Incomplete tag insert
- Scaffold Released for Access tag insert