Scaffold
-
Leveling Jacks
Adjustable leveling jacks can be set to custom heights & provide a solid foundation for the scaffolding frame.Adjustable Leveling Jack is ideal for ensuring a solid foundation for a scaffolding frame, especially when it is assembled along an external wall. -
Putlogs
Putlogs secure scaffolding directly to a wall in light duty applications. Standard & trussed putlogs are available.- Only to be used for light duty applications
- Spans over a larger area
- Putlogs are used as a low cost alternative for larger platforms or bridging obstructions
-
Hoist Arm and Well Wheel
Swivel head hoist arm & well wheel provides an easy way to lift loads up to 100 lbs. to the top of the scaffolding structure.- Used to hoist tools up to workers
-
End Guard Rail for Side Bracket
End guard rail is used with side brackets as a guar rail to ensure worker safety.- Used with side brackets as a guard rail
-
Lateral Braces
Lateral braces are used with cat-a-corner braces to provide extra support. Connect perpendicularly at the base to keep scaffolding squared.- Needed every 20’ in height
-
Cat-A-Corner Braces
Cat-a-corner braces connect diagonally at the scaffold base to provide strength & extra stability.- Needed every 20’ in height
-
End Brackets
End brackets attach to the end of scaffolding so platforms can be run parallel to frames, adding additional work space & adjustable height.- Adds adjustable work height
- Easy to set up and take down
- Add additional work space
-
Side Brackets
Side brackets extend scaffolding platform closer to building or wall for extra work space.Side Brackets or Saddle Hangers are built for Bil-Jax Scaffold Systems. Adjustable options as well as Tube or Plate end options are available. Standard tube size is 7. Made in the USA. Capacity 500 lb. All brackets should be pinned properly in place. -
Arm Braces
Arm braces provide scaffolding access from the braced side. Available in hole end, notch end & trussed styles.- Braces available in “hole end”, “notch end”, or “trussed” types
- End type to coordinate with your lock type
-
TUF-N-LITE Hinged Ladder Board
Our popular Tuf-N-Lite aluminum & plywood walkboard with a hinged hatch for internal access. Great for working in tight or hard to reach areas.- The Tuf-N-Lite Walkboard with an access hatch
- Hinged hatch allows for internal access
-
Access Ladder System
Lightweight steel access ladder system provides access to platforms inside multi-level scaffolding units.- Allows worker access to platform inside of the scaffold unit
- Can be used on rolling or stationary towers
- Lightweight steel construction
- Ladder hooks to frame horizontal - rests on a walk-board
- Top hinge platform offered, allowing worker to have access through platform by hinging it out of the way. Platform hinges back into position to offer a full working deck
-
Climbing Ladder
Climbing ladders attach to the outside of scaffolding frames & offer 12" step spacing for easy access.- Climbing ladders offer 12" step spacing for scaffold access
- Easily attaches to the outside of frames
- Can be used with conventional guard railing, Panel Guard, or Easi-Guard
-
Replacement Decals
Replacement decals for scaffolding components ensure safety compliance.- Panel Guard Warning Decal
- Caster Decal
- Leveling Caster/Leveling Jack Extension Decal
- Scaffold Frame Warning Decal
- Personnel Bracket Warning Decal
- Guard Railing Decal
- Walkboard/Catwalk Warning Decal (Tuf-N-Lite)
- Hoist Arm Warning Decal
- Expanded Metal Walkboard/Catwalk Decal
-
Safety Documents
Scaffolding safety documents include safety tips, OSHA regulations, safety video, decals, cards & more.- Tips on Scaffold Safety / Safety Rule
- OSHA Safety and Health Regulations for Construction
- Recommended Scaffold Erection Procedures
- Caution Envelope with Wire
- Scaffold Safety Packet (includes: LL-204-01, LL-204-02, LL-204-03, LL-204-04, LL-204-11)
- Instructions for Erecting Rolling Towers
- Commitment to Safety Package (includes: 1 scaffold safety video, 20 frame decals, 25 LL-204-05 scaffold safety packets, 1 laminated certificate)
- Scaffold Check Guide Cards
-
Rolling Tower Package
Rolling Tower Package features a sturdy rolling tower with large work platform, adjustable levels & easy access guard rail system for safety.Bil-Jax Rolling Tower Packages are manufactured from high strength steel tubing with coped and arc welded perimeter joints on all frames. The rolling towers offer a large work platform with adjustable platform levels and an easy access guard rail system. Standard 7 tube size. All standard components are quick and easy to assemble. -
Canopy Top – Weather Protection
Attach the Canopy Top to scaffolding for weather protection. Fits any 5' frame & adjusts up to 10'.The Canopy Top is used along the top of a scaffold set-up to hold weather protection material in place. It fits on top of any 5' frame. Brackets to hold 2 x 4 wood have been welded to the outside leg. Weather Protection Clips can also be used. Clips are made of sturdy PVC plastic and snap firmly into place to hold plastic weather material to scaffold. -
Knock-Down Frame
Modular scaffolding knock-down frame features a slim design that fits through spaces as small as 13" wide for access to restricted openings.- Knock-down frames fit through a 13″ diameter opening.
- Available with: J-Lock, C-Lock, and T-Lock
- Frame Sides and Extenders sold separately.
-
Double Step Frames
Double step frames consist of steel beams conjoined into a single unit with a ladder-like structure on both sides. Allows workers to climb up scaffolding.- Shown with C-Lock
- Can be ordered with inserts attached
-
Open Ladder Frames
Open ladder frames feature a ladder-like structure on one side & a walk-through opening on the other. Climb up or walk the length of scaffolding.- Shown with C-Lock
- Can be ordered with inserts attached
-
Pedestal Scaffold Frame
Pedestal scaffold frame features a higher level for use as a material shelf & a lower level for a walkboard. Ideal for single-story brickwork.- Walkboard level height adjusts from 24″ to 48″.
-
“R” Ladder Frame
"R" ladder center access frames are built with rungs spaced 12" apart instead of 15" for easier climbing up the scaffold.- Normal 5×5 frame rung spacing is over 15”
- Shown with T-Lock
- Can be ordered with inserts attached