Back to ARB Virtual Event View Cart: 0 items

Scaffold

Home » Scaffold » Page 2

Scaffold

  • Ring Lock – Stair Stringer

    These Ring Lock Stringers are several pieces of steel conjoined together to form one side of a scaffolding stair unit.
    • Side pieces that make the stair unit
    • Two stringers are needed to make a complete stair unit
  • Pro-Jax Components

    Guard rails, outriggers, guard panels, metal & plywood decks, arm braces, ladder frame, casters for Pro-Jax scaffolding.
    Guard Rails, outriggers, guard panels, metal deck, plywood deck, arm brace, ladder frame, casters
  • Ring Lock – Stair Tread

    Stair treads for ring lock scaffolding attach to stringers to form stairs. Raised holes provide traction.
    • The step piece that attaches to a stringer
    • Raised holes for traction
  • Shoring Components

    All the shoring components needed to safely support scaffolding. Leveling jack, shoring head, insert pin/collar, top nut & brass plate.
    • Leveling Jack
    • Shoring Head
    • Insert Pin and Collar
    • Top Nut
    • Base Plate
  • Shoring Frames

    These are the main components of shoring scaffolding and are used to build up shoring scaffolding units.
    • See page 14 of our Scaffold Catalog for bracing information
  • Heavy Duty Shoring Posts

    Galvanized heavy duty steel posts are made for jobs requiring extra strength and durability and are rated up to 6,000 lbs. (5,000 lbs. if height exceeds 10’). They are easily adjustable and available in a range of sizes.
    • Galvanized heavy duty steel posts
    • Easily adjustable
    • Range of sizes available
  • Shoring Posts – Electroplated

    Electroplated steel shoring posts are easily adjustable & offer a strong, durable, corrosion-resistant solution for securing scaffolding.
    • Electroplated steel posts
    • Easily adjustable
    • Range of sizes available
  • Shoring Posts – Galvanized

    Electroplated steel shoring posts are easily adjustable & offer a strong, durable, corrosion-resistant solution for securing scaffolding.
    • Galvanized steel posts
    • Easily adjustable
    • Range of sizes available
  • Heavy Duty Stair Tower

    Heavy duty stair tower package provides 100' access & includes all components for complete scaffold assembly.
    Bil-Jax offers a heavy duty stair scaffolding system for worker access to buildings, bridges, observation towers, or renovation done inside or outside. The stairs can also be used for access in a scaffold set-up. Stair Tower Packages include frames, braces, leveling jacks, stair sections with handrails, stair rests, full top platform and top panel guard.
  • Tube-N-Clamp Components

    This scaffolding system uses vertical & horizontal steel clamps connected with right angle clamps. Assemble yourself for versatility.
    Components used to build Tube-N-Clamp scaffolding
  • Scaffold Tie Brace

    Adjustable scaffold tie braces secure scaffolding to a wall & may be used in place of outriggers when safe.
    • Adjusts from 4″ – 32″ from scaffold structure
  • Easi-Guard Panel System

    Easi-Guard Panel System assembles quickly & easily to provide safety on scaffold platforms. Includes top rail & chained mid-rail.
    • Easy and quick to install
    • End panels use steel tubular top rail with chained mid-rail for easy platform entry
    • End panels include built in 6" steel toeboard
    • End panel toeboard adjusts to accomodate various deck styles
    • Easi-Guard and Panel-Guard components are not interchangeable.
  • Outriggers

    Triangular outrigger brackets increase scaffolding base width & provide stability. Use with casters or leveling jacks.
    • Used to increase the base width
    • Increase the stability of the tower
    • Can be used with casters or leveling jacks
  • Swing Gates

    Swing gates for Open End frames allow workers to move between scaffold sections & provide a guard rail for safety.
    • Used specifically for Open End Frames
    • Allows workers to move between scaffold sections
    • Provides a guard rail between scaffold sections
  • Intermediate Guard Rails

    Intermediate guard rails attach to open end scaffold frames to ensure worker safety. Side & end panels available.
    • Used for Open End Frames
    • Side and end panels available
  • Panel Guard System

    A complete safety solution that includes a top rail, mid-rail & toeboard. Installs quickly & easily.
    • Easy and quick to install
    • Panels include top rail, mid-rail and toeboard
    • Hinge pins are recommended to prevent uplift
    • Easi-Guard and Panel-Guard components are not interchangeable.
  • Replacement Parts for Scaffold

    Scaffold replacement parts including clamps, hooks, brace slides & rivets, leveling nuts, screws, & U-bolts.
    Half Outrigger Clamp, Putlog Clamp Hook, Gooser Brace Slide, Leveling Nut, Set Screw, Lever Tail Nut 5" Long , Brace Rivet with 3 Washers, U-bolt only - Putlong Angle Hanger, Thumb Screw
  • Brackets & Clamps

    Wide variety of brackets & clamps for scaffolding. Clamps & brackets for notched & hole braces, parallel tube clamps, B-lock clamps.
    Various clamps to be used for scaffolding
  • Drop Forged Clamps

    Complex drop forged steel clamps precisely engineered to hold scaffolding tubes together safely & efficiently. Rigid & swivel styles available.
    • Clamps that are used to hold scaffolding tubes together
    • Offered in both rigid and swivel
  • Putlog Accessories

    Accessories help simplify mounting putlogs. Angle hangers, saddles, spreaders & putlog support with clamps.
  • Steel Toeboards

    Toeboards prevent tools & other objects from falling from scaffolding decks & causing injury to people below.
    • Provides safety to the scaffolding platforms
    • Must be used on all scaffolds in compliance with local, state, and federal regulations
  • Scaffold Guard Rails

    Galvanized tubing guard rails attach to scaffolding to ensure worker safety. Compatible with B, F, or U lock guard rail posts.
    • Galvanized tubing that attaches to scaffolding for safety
    • Use with B, F, or U Lock Guard Rail Posts
  • Base Plates/Rubber Pad

    Base plates serve as scaffolding unit feet, preventing slipping & sinking. Includes rubber pad to prevent marring.
    • The “feet” to scaffolding units • Comes in both rigid and swivel configurations
    • Rubber pad used to prevent maring of high end finished floors (hardwood, marble, etc.)
  • Leveling Jacks

    Adjustable leveling jacks can be set to custom heights & provide a solid foundation for the scaffolding frame.
    Adjustable Leveling Jack is ideal for ensuring a solid foundation for a scaffolding frame, especially when it is assembled along an external wall.