- Used to increase the base width
- Increase the stability of the tower
- Can be used with casters or leveling jacks
Scaffold
-
Outriggers
Triangular outrigger brackets increase scaffolding base width & provide stability. Use with casters or leveling jacks. -
Pedestal Scaffold Frame
Pedestal scaffold frame features a higher level for use as a material shelf & a lower level for a walkboard. Ideal for single-story brickwork.- Walkboard level height adjusts from 24″ to 48″.
-
Shore Head and Shore Jacks
Shore heads & shore jacks provide temporary scaffolding support & enable you to make structural repairs.- various sizes of shore heads and shore jacks with heads
-
Brackets & Clamps
Wide variety of brackets & clamps for scaffolding. Clamps & brackets for notched & hole braces, parallel tube clamps, B-lock clamps.Various clamps to be used for scaffolding -
Knock-Down Frame
Modular scaffolding knock-down frame features a slim design that fits through spaces as small as 13" wide for access to restricted openings.- Knock-down frames fit through a 13″ diameter opening.
- Available with: J-Lock, C-Lock, and T-Lock
- Frame Sides and Extenders sold separately.
-
Canopy Top – Weather Protection
Attach the Canopy Top to scaffolding for weather protection. Fits any 5' frame & adjusts up to 10'.The Canopy Top is used along the top of a scaffold set-up to hold weather protection material in place. It fits on top of any 5' frame. Brackets to hold 2 x 4 wood have been welded to the outside leg. Weather Protection Clips can also be used. Clips are made of sturdy PVC plastic and snap firmly into place to hold plastic weather material to scaffold. -
Replacement Parts for Scaffold
Scaffold replacement parts including clamps, hooks, brace slides & rivets, leveling nuts, screws, & U-bolts.Half Outrigger Clamp, Putlog Clamp Hook, Gooser Brace Slide, Leveling Nut, Set Screw, Lever Tail Nut 5" Long , Brace Rivet with 3 Washers, U-bolt only - Putlong Angle Hanger, Thumb Screw